General Inspection | 11/17/2017 | 11/17/2017 | 11/20/2017 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/2/2017 | 11/2/2017 | 11/3/2017 | P | PART |
Andy J. Long
|
|
|
Need to clean up wind blown trash in Warm Springs Creek adjacent to project...email sent to Noah with RCH.
Almost ready for final after final cleanup
|
Random Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Michael Zawacki
|
|
|
landscaping complete. Site clean, interior work in progress.
|
General Inspection | 10/11/2017 | 10/11/2017 | 10/12/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2017 | 9/26/2017 | 9/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/8/2017 | 9/8/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/24/2017 | 8/24/2017 | 8/24/2017 | | PASS |
Andy J. Long
|
|
|
No trackout or discharges. Silt fence BMP in good condition. Approved
|
General Inspection | 8/9/2017 | 8/9/2017 | 8/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP. Trash is contained. No trackout. Property is now fenced. No corrections.
|
General Inspection | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. Road and gutter in front of site are free of trackout & loose sediment. Silt fence installed between project and Warm Spring Creek (now dry). Approved.
|
BMP Violation | 5/12/2017 | 5/17/2017 | 5/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
Concrete washout installed, trash containment set up.
|
General Inspection | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Started without site preparation inspection. No concrete washout. No trash containment. Called RP requesting that he schedule site preparation inspection in the future, have concrete washout on site, and contain trash. Silt fence is ok. Follow up scheduled for Wednesday.
|
Issue & PRINT permit SFD | | | 4/14/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/8/2016 | | 12/8/2016 | | DONE |
Andy J. Long
|
|
|
SWPPP approved. Valid RP and PD designated. Site preparation inspection required.
|
Application received | | | 11/23/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 23 2016 4:46PM
|