Site Final | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Andy J. Long
|
|
|
Work complete. No disturbed area or loose materials remaining onsite. No temporary BMPs. ESC permit finaled.
|
Site Final | 8/18/2017 | 8/23/2017 | 8/25/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/18/2017 | 8/18/2017 | 8/18/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Preparation | 2/15/2017 | 2/16/2017 | 2/16/2017 | A | PASS |
Melissa Jannusch
|
|
|
Met with (RP) Craig on site. Flat dirt lot. Low risk of erosion. Okay to start.
|
Issue & PRINT permit COM | | | 2/13/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/27/2016 | | 12/27/2016 | | DONE |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved. Valid PD, need to designate RP
|
Application received | | | 12/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 1 2016 12:31PM
|