Site Final | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 | | PASS |
Michael Zawacki
|
|
|
Final stabalization complete. Talked to business in area, they said work was done last year. Recommend closing out permit.
|
General Inspection | 8/18/2017 | 8/18/2017 | 8/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/24/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Site Preparation | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
Andy J. Long
|
|
|
Josh Phone #: ###-####-please take a storm water pollution card with you as he does not have one on sight
Flat site with existing gravel gound cover. Industrial and storage site. No BMPs required other than sweeping up any track out that may occur, dust control if necessary, and pollution prevention practices. Will drop off permit sign on Monday
|
Permit Ready to Issue | | | 2/22/2017 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/22/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/2/2017 | | 2/2/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver approved. RP to be designated.
|
Routing - Erosion and Sediment | 1/12/2017 | | 1/12/2017 | | DONE |
Andy J. Long
|
|
|
Please submit ESC plan with site map & narrative, or submit ESC plan waiver document.
|
Application received | | | 12/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 2 2016 10:06AM
|