DOC - Permit Finaled | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/3/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Andy J. Long
|
|
|
Trackout was cleaned. Needs ESC permit sign to be posted.
|
Tracking Control | 3/1/2017 | 3/1/2017 | 3/3/2017 | P | PEND |
Andy J. Long
|
|
|
working on Millwell Park builders and developer to set up sweeping schedule and concrete washout.
|
Tracking Control | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | CANC |
Andy J. Long
|
|
|
duplicate inspection
|
Permit Ready to Issue | | | 2/14/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 2/14/2017 | | DONE |
|
|
|
|
Application received | | | 12/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2016 4:22PM
|