DOC - Permit Finaled | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Dirt is contained, road and DIs clean. Washout area is dry and needs to be cleaned, drivers kept washing out after washout was full.
|
General Inspection | 5/16/2018 | 5/17/2018 | 5/18/2018 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/14/2018 | 5/14/2018 | 5/16/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP. Lots of trackout on site.
|
General Inspection | 2/12/2018 | 2/12/2018 | 2/15/2018 | | PASS |
Michael Zawacki
|
|
|
WIP
|
General Inspection | 12/26/2017 | 12/26/2017 | 12/26/2017 | | PASS |
Michael Zawacki
|
|
|
WIP at site. Snow on ground. No violations observed.
|
Issue & PRINT permit SFD | | | 12/21/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/27/2016 | | 12/27/2016 | | DONE |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved.
|
Application received | | | 12/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2016 8:06PM
|