Site Final | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Andy J. Long
|
|
|
Construction complete, no loose construction materials or dirt & debris. Adajacent lot owned by North Pointe and retains stormwater. No temp BMP removal required. No corrections, all permits finaled.
|
General Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Michael Zawacki
|
|
|
Site work complete. Some storage out front for material.
|
General Inspection | 10/18/2017 | 10/20/2017 | 10/19/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/17/2017 | 10/17/2017 | 10/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2017 | 8/28/2017 | 8/31/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | PART |
Andy J. Long
|
|
|
Need to empty full trash container and cleanup staging area. Follow up inspection scheduled
|
General Inspection | 5/22/2017 | 5/22/2017 | 5/22/2017 | P | PASS |
Andy J. Long
|
|
|
WIP on new cafe. Staging area is in compliance. No trackout or discharges observed.
|
Site Preparation | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Andy J. Long
|
|
|
Jay Phone #: ###-####
Permit sign posted. Site development around building pad is complete with paving and permeable pavers. Notified RP to keep drainage areas to pearmeable pavers clean and no stockpiling on pavers. Will use vacant lot to east for staging and dig a lined concrete washout. Storm drain havs filter fabric barriers installed. Will work with Bach Homes/Kensington to maintain.
Approved for construction.
|
Issue & PRINT permit COM | | | 3/20/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/6/2017 | | 1/6/2017 | | DONE |
Andy J. Long
|
|
|
ESC narrative and site map approved. Valid PD designated, need to provide RP prior to permit issue.
|
Application received | | | 1/4/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 4 2017 9:53AM
|