Site Final | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Melissa Jannusch
|
|
|
Landscaping complete. Temp BMPs removed. No trash or trackout on site. Okay to close ESC permit.
|
General Inspection | 3/13/2017 | 3/14/2017 | 3/14/2017 | P | PASS |
Melissa Jannusch
|
|
|
Perimeter control wattles are in place. Sign is posted. Corrections requested stake and trench wattles, install construction entrance or implement frequent sweeping of track out, use the concrete washout, if using adjacent site of access stockpiling clean trackout next to adjacent site. Talked with RP Rollo and requested corrections. Okay to continue work.
|
Site Preparation | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Did not call in site preparation inspection before digging.
|
Permit Ready to Issue | | | 2/23/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 2/23/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/27/2017 | | 1/27/2017 | | PASS |
Melissa Jannusch
|
|
|
ESC, plan and narrative provided in SWPPP. ESC controls include use of a stabilized construction entrance, concrete washout, staging area, inlet protection for DIs on Barber Dr, and a silt fence on the south side of the lot.
|
Application received | | | 1/16/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2017 11:49AM
|