Aging Inspection | 3/6/2018 | 3/6/2018 | 3/7/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | NR |
Andy J. Long
|
|
|
DI bags left behind after stabilization of projects in Belmar. Need to remove DI bags to final ESC permits still open.
|
BMP Violation | 4/7/2017 | 4/10/2017 | 4/17/2017 | P | PART |
Andy J. Long
|
|
|
Mud and dirt has been removed from sidewalk. No new trackout.
Correction request to sweep street and change out DI bags at south end of Hacienda.
|
General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | FAIL |
Andy J. Long
|
|
|
Dirt stockpiled on sidewalk since excavation. Trackout, dirty street. No housekeeping. Will re-inspect Monday to get homes on Hacienda completed.
|
Tracking Control | 2/28/2017 | 3/7/2017 | 3/7/2017 | A | FAIL |
Andy J. Long
|
|
|
follow up
Trackout may have been cleaned end of last week, but continued activity has added amount of excavated dirt on sidewalk and gutter. Will allow for placement or removal of backfill
|
Tracking Control | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PEND |
Melissa Jannusch
|
|
|
Correction requested: clean dirt in gutter, add BMPs to prevent further trackout Met with RP he plans to address corrections
|
Site Preparation | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PEND |
Melissa Jannusch
|
|
|
Grading work has started. Dirt in street and sidewalk. RP plans to clean dirt. Possibly add BMP on perimeter
|
Issue & PRINT permit SFD | | | 2/28/2017 | | DONE |
|
|
|
|
Application received | | | 1/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2017 9:32AM
|