Site Final | 6/11/2018 | 6/13/2018 | 6/12/2018 | P | CANC |
Andy J. Long
|
|
|
|
Site Final | 6/11/2018 | 6/13/2018 | 6/12/2018 | P | CANC |
Andy J. Long
|
|
|
|
Site Final | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/10/2018 | 5/10/2018 | 5/10/2018 | | PASS |
Andy J. Long
|
|
|
WIP on HRN home. See also ESC18-00020. Subdivision BMPs installed.
|
General Inspection | 4/25/2018 | 4/25/2018 | 4/25/2018 | | PART |
Michael Zawacki
|
|
|
Home is complete, yard is bare and torn up, looks like prep for sprinkler system. Lots of dirt on front sidewalk.
|
General Inspection | 4/10/2018 | 4/10/2018 | 4/12/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/26/2018 | 3/26/2018 | 3/26/2018 | | PART |
Michael Zawacki
|
|
|
Small bit of sediment has ran into neighbors yard, water came of roof. Standing water on south east side of house.
|
General Inspection | 3/9/2018 | 3/9/2018 | 3/9/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/22/2018 | 2/22/2018 | 2/22/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/7/2018 | 2/7/2018 | 2/8/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on SFH. Lot clean, some dirt on sidewalk.
|
General Inspection | 1/19/2018 | 1/19/2018 | 1/22/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/4/2018 | 1/4/2018 | 1/5/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/20/2017 | 12/20/2017 | 12/20/2017 | | FAIL |
Michael Zawacki
|
|
|
Foundation work begun. Pile of backfill along sidewalk, no protection. Has eroded onto sidewalk and street.
|
General Inspection | 12/5/2017 | 12/5/2017 | 12/5/2017 | | PASS |
Michael Zawacki
|
|
|
No work has begun.
|
Issue & PRINT permit SFD | | | 11/27/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/3/2017 | | 2/3/2017 | | PASS |
Melissa Jannusch
|
|
|
BMPs include construction, concrete washout, staging area, inlet protection and silt fence along Hoot Owl Dr.
|
Application received | | | 1/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 27 2017 11:45AM
|