Site Final | 12/28/2017 | 1/22/2018 | 1/23/2018 | A | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/26/2017 | 12/26/2017 | 12/28/2017 | | PEND |
Andy J. Long
|
|
|
waiting for snow melt to check for site final
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Michael Zawacki
|
|
|
Entire area paved. Currently landscaping in progress.
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
Vertical construction only. No earth disturbing activities. Pads are poured, mixer has perimeter controls. No spilled concrete visible.
|
Telephone call | | | 7/28/2017 | | DONE |
|
|
|
per email from Butch Henry RP will be Trent Buster for vertical consturction
|
Issue & PRINT permit COM | | | 7/28/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/17/2017 | | 3/17/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan and site map submitted under ESC16-01617 with site grading and utilities permit. No contractor or RP specified for vertical construction. This permit with cover all construction acitivity related to the 8 enclosed buildings and 4 canopies.
|
Application received | | | 2/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 27 2017 1:33PM
|