General Inspection | 11/8/2017 | 11/8/2017 | 11/9/2017 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/25/2017 | 8/28/2017 | 8/31/2017 | A | PEND |
Andy J. Long
|
|
|
Developer backfilling hole on lot and will remove stockpiles from end of Goshawk
This home is to be landscaped soon. Tradewinds will begin construction after developer has completed compaction.
|
General Inspection | 8/25/2017 | 8/28/2017 | 8/28/2017 | A | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 4/7/2017 | 4/10/2017 | 4/11/2017 | P | PASS |
Andy J. Long
|
|
|
Inspection 4/10 PM. BMPs installed. Trackout from hauling operation has been cleaned. Permit sign posted.
|
Site Preparation | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Andy J. Long
|
|
|
Dave Phone #: ###-####
Subdivision BMPs installed. Approved to start. Will re-inspect Monday for corrections related to phase 8 & 9 Eyrie Canyon.
|
Issue & PRINT permit SFD | | | 3/31/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/13/2017 | | 3/13/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD designated. ESC site preparation inspection REQUIRED.
|
Application received | | | 3/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 6 2017 4:25PM
|