DOC - Permit Finaled | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Andy J. Long
|
|
|
ESC inspections conducted on all sites are entered under main site permit Tablerock Subdivision, see ESC16-00945. This permit will remain open till permit conditions are met.
Units 2349 Warm Springs to 2393 have been finaled.
|
General Inspection | 1/11/2018 | 1/11/2018 | 1/12/2018 | | PART |
Andy J. Long
|
|
|
No trackout to Warm Springs, silt fence installed below access drive retaining wall.
Correction request for next week: - pick up loose trash around site, especially wind blown tyvek.
|
General Inspection | 12/27/2017 | 12/27/2017 | 12/28/2017 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical and interiors. Site frozen, no issues.
|
General Inspection | 12/6/2017 | 12/6/2017 | 12/6/2017 | | PASS |
Michael Zawacki
|
|
|
WIP. Western most buildings are newest and being framed. Others are mostly interior work. Parking isn't onsite, no ttrackout. Rear perimeter control intact. Site is kept clean, project manager is always there.
|
General Inspection | 11/17/2017 | 11/17/2017 | 11/17/2017 | | CANC |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 4/18/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/18/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/17/2017 | | 3/17/2017 | | DONE |
Andy J. Long
|
|
|
All ESC permits for 10 SFHs in Tablerock Subdivision are approved. ESC plan and SWPPP submitted under ESC16-00945 during subdivision development. Same RP designated.
|
Application received | | | 3/14/2017 | | |
|
|
|
|