General Inspection | 1/18/2018 | 1/18/2018 | 1/18/2018 | | PASS |
Andy J. Long
|
|
|
ESC inspections conducted on all sites are entered under main site permit Tablerock Subdivision, see ESC16-00945. This permit will remain open till permit conditions are met.
Units 2349 Warm Springs to 2393 have been finaled.
|
DOC - Permit Finaled | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/3/2018 | 1/3/2018 | 1/4/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/14/2017 | 12/14/2017 | 12/14/2017 | | PASS |
Michael Zawacki
|
|
|
Inspected 12/11. All rear dirt work is contained by retaining wall. No concrete work taking place. Trash was being picked up. Some dirt on sidewalk which was blocked by shower tubs.
|
General Inspection | 11/29/2017 | 11/29/2017 | 11/29/2017 | | CANC |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 4/18/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/18/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/17/2017 | | 3/17/2017 | | DONE |
Andy J. Long
|
|
|
All ESC permits for 10 SFHs in Tablerock Subdivision are approved. ESC plan and SWPPP submitted under ESC16-00945 during subdivision development. Same RP designated.
|
Application received | | | 3/14/2017 | | |
|
|
|
|