Site Final | 6/11/2018 | 6/13/2018 | 6/12/2018 | P | CANC |
Andy J. Long
|
|
|
|
Site Final | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Aging Inspection | 4/11/2018 | 4/11/2018 | 4/12/2018 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 2/9/2018 | 2/9/2018 | 2/9/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/22/2017 | 5/22/2017 | 5/22/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Issue & PRINT permit SFD | | | 5/3/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 3/17/2017 | | 3/17/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD designated. Site preparation inspection required, call ###-####
|
Application received | | | 3/16/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2017 4:37PM
|