Site Final | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Sly
|
|
|
|
Tracking Control | 4/19/2017 | 4/26/2017 | 5/1/2017 | P | PASS |
Melissa Jannusch
|
|
|
Trackout has been cleaned up. Okay.
|
Tracking Control | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | PEND |
Melissa Jannusch
|
|
|
Abram street has significant trackout along excavated area. Hand sweeping occurring at time of inspection. Check back to make sure trackout has been satisfactorily cleaned up.
|
Site Preparation | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Andy J. Long
|
|
|
Tracy Phone #: ###-####
Approved for construction. Need to install inlet protection on Coolwater
|
Issue & PRINT permit SFD | | | 4/5/2017 | | DONE |
|
|
|
|
Application received | | | 3/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2017 3:54PM
|