Site Final | 9/11/2017 | 9/14/2017 | 9/13/2017 | A | PASS |
Andy J. Long
|
|
|
Call me 30 prior to the inspection if you need me there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Temp BMPs removed. No disturbed area or construction materials remaining
|
Site Preparation | 7/21/2017 | 7/24/2017 | 7/24/2017 | A | PASS |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 3/31/2017 | | DONE |
|
|
|
|
Telephone call | | | 3/31/2017 | | DONE |
|
|
|
Left a message for Eldon that this permit is ready to be picked up and the fees have already been paid
|
Issue & PRINT permit COM | | | 3/31/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/28/2017 | | 3/30/2017 | | DONE |
Andy J. Long
|
|
|
ESC site plan with narrative approved. Valid RP and PD designated.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2017 | | DONE |
|
|
|
|
Application received | | | 3/28/2017 | | |
|
|
|
|