Aging Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/8/2018 | 10/8/2018 | 10/8/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/6/2018 | 8/6/2018 | 8/6/2018 | | PASS |
Michael Zawacki
|
|
|
Most major disturbances complete. Some pit run and track steer stored in parking lot. Masons still on site. Some trash piles on east end of site.
|
General Inspection | 6/5/2018 | 6/5/2018 | 6/5/2018 | | PASS |
Michael Zawacki
|
|
|
McAlvain on site with excavator, looks like installation for stormwater retention vault or conveyance. All other work is contained. No ESC issues at site
|
General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 | | PASS |
Michael Zawacki
|
|
|
Small disturbed area. Most work is interior or contained.
|
General Inspection | 1/30/2018 | 1/30/2018 | 1/30/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Very little dirt work, area has been trenched and is already filled in. Storage spread across site, most work is in fenced off areas.
|
Issue & PRINT permit COM | | | 8/14/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/10/2017 | | 5/10/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Need to designate Responsible Person. Site preparation inspeciton is required.
|
Application received | | | 4/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2017 1:13PM
|