DOC - Permit Finaled | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and occupied.
|
Aging Inspection | 3/27/2018 | 3/27/2018 | 3/28/2018 | | PART |
Michael Zawacki
|
|
|
Protection still in DIs. Neighboring lot still has stockpiling.
|
Site Final | 1/22/2018 | 1/22/2018 | 1/22/2018 | A | NR |
Andy J. Long
|
|
|
Need to clean up adjacent lot, some rock and materials still staged there.
|
Site Preparation | 5/19/2017 | 5/26/2017 | 5/26/2017 | A | FAIL |
Melissa Jannusch
|
|
|
DI bags have not been cleaned out. Need to clean DI bags. Will follow up next week.
|
Site Preparation | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Melissa Jannusch
|
|
|
Met with contractor onsite. Sign is posted. Wattle place along back of site perimeter to protect the intermittent creek. Went over ESC requirements with contractor. Correction requested: DI bags need to be changed and gutter needs to be swept up. Follow up inspection scheduled to check for compliance.
Brad Phone #: ###-####
|
Issue & PRINT permit SFD | | | 5/18/2017 | | DONE |
|
|
|
|
Application received | | | 4/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2017 3:41PM
|