Site Final | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Adjacent lot had hydroseed/tacifier applied to it. No ESC corrections, ESC permit finaled.
|
Site Preparation | 5/30/2017 | 5/31/2017 | 5/31/2017 | A | PASS |
Melissa Jannusch
|
|
|
Sign is posted. Subdivision BMPs are in place and ok. Talked with RP about ESC requirements.
Greg Phone #: ###-####
|
Issue & PRINT permit SFD | | | 5/30/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/25/2017 | | 5/25/2017 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid RP and PD designated. Site preparation inspection required
|
Application received | | | 4/28/2017 | | |
|
|
|
|