General Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/13/2018 | 3/13/2018 | 3/13/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/22/2018 | 2/22/2018 | 2/23/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Melissa Jannusch
|
|
|
Subdivision BMPs ok. Hootowl needs sweeping. Rollo Phone #: ###-####
|
Issue & PRINT permit SFD | | | 5/31/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/4/2017 | | 5/4/2017 | | PASS |
Andy J. Long
|
|
|
ESC narrative with site map approved. Valid RP and PD. Site preparation inspection required.
|
Application received | | | 5/2/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 2 2017 9:50AM
|