Site Final | 7/19/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/29/2018 | 6/29/2018 | 6/29/2018 | | PART |
Michael Zawacki
|
|
|
Stucco crew on site. Lots of stucco washout and waste dumped on ground.
|
General Inspection | 6/14/2018 | 6/14/2018 | 6/15/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Michael Zawacki
|
|
|
Home is prepped for stucco, work hasn't begun an install.
|
General Inspection | 5/15/2018 | 5/15/2018 | 5/15/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. There is a contained stockpile in front yard that looks like combo of dirt and building trash.
|
General Inspection | 4/26/2018 | 4/26/2018 | 4/27/2018 | | PASS |
Andy J. Long
|
|
|
Permit posted, trash and materials constained. DI bags installed.
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/16/2018 | 3/16/2018 | 3/20/2018 | | FAIL |
Andy J. Long
|
|
|
Correction request:
- sweep culdesac - repair damaged dumpster on north side of culdesac and pick up any loose trash
|
Site Preparation | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | PART |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Permit sign posted. Need to install DI protection on south side of Taboo culdesac before excavation.
Verbal correction to Clint.
|
Permit Ready to Issue | | | 6/20/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 6/20/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/1/2017 | | 6/1/2017 | | DONE |
Melissa Jannusch
|
|
|
Special waiver approved.
|
Application received | | | 5/24/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 24 2017 9:50AM
|