General Inspection | 7/25/2018 | 7/25/2018 | 7/25/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/10/2018 | 7/10/2018 | 7/10/2018 | | PASS |
Michael Zawacki
|
|
|
Lot has been prepped with topsoil, no landscaping yet. Site is clean, trash box in driveway.
|
General Inspection | 6/25/2018 | 6/25/2018 | 6/25/2018 | | PASS |
Andy J. Long
|
|
|
Painting and landscaping in progress. Subdivision BMPs installed.
|
Random Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on landscaping. No discharges or trackout off Taboo. Storm drains have sediment protection. Trash contained.
|
General Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/16/2018 | 5/16/2018 | 5/16/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/11/2018 | 4/11/2018 | 4/12/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. Some lumber scraps laying around.
|
General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 9/14/2017 | 9/14/2017 | 9/19/2017 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
|
Permit Ready to Issue | | | 7/25/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 7/25/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/9/2017 | | 6/9/2017 | | PASS |
Andy J. Long
|
|
|
Maintain and utilized existing East Valley subdivision BMPs, post permit and onsite housekeeping required.
|
Application received | | | 6/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 1 2017 10:36AM
|