General Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. BLD finaled. No ESC corrections needed.
|
DOC - Permit Finaled | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/30/2018 | 3/30/2018 | 3/30/2018 | | PASS |
Michael Zawacki
|
|
|
Landscapers on site.
|
Site Preparation | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Andy J. Long
|
|
|
John Phone #: ###-####
ESC permit sign posted. Active projects in compliance. Perimeter wattles installed along front of project.
|
Issue & PRINT permit SFD | | | 7/3/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/8/2017 | | 6/8/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved. Valid RP and PD designated. Site preparation inspection required.
|
Application received | | | 6/2/2017 | | |
|
|
|
|