Site Final | 9/11/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Andy J. Long
|
|
|
Home complete. NO temp BMPs left onsite or in strom drain. ESC permit conditions satisfied.
|
Aging Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Aging Inspection | 7/10/2018 | 7/10/2018 | 7/11/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/10/2018 | 5/14/2018 | 5/16/2018 | P | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 5/10/2018 | 5/10/2018 | 5/10/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Andy J. Long
|
|
|
steve ###-####
ESC permt sign posted. Reviewed ESC permit conditions and best practices. No MS4 storm drains in proximity; stabilized accesss to backyard construction area. Approved.
|
Issue & PRINT permit SFD | | | 8/1/2017 | | DONE |
|
|
|
|
Application received | | | 6/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 6 2017 3:26PM
|