General Inspection | 7/10/2018 | 7/10/2018 | 7/10/2018 | | PASS |
Andy J. Long
|
|
|
No disturbed area, temp BMPs or disturbed area found on site. ESC permit finaled.
|
DOC - Permit Finaled | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 | | PASS |
Michael Zawacki
|
|
|
School. Will reinspect when students not on site.
|
Permit Ready to Issue | | | 1/18/2018 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/18/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/21/2017 | | 6/21/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid PD. RP to be determined.
|
Application received | | | 6/16/2017 | | |
|
|
|
|