Site Final | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Andy J. Long
|
|
|
Work complete, site cleaned up and landscaped/stabilized. No ESC corrections, all permits finaled.
|
General Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 | | CANC |
Andy J. Long
|
|
|
|
Issue & PRINT permit COM | | | 10/27/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/14/2017 | | 8/14/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map provided. Valid PD, RP to be determined with contract award. Site preparation inspection is required.
|
Application received | | | 7/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2017 2:29PM
|