General Inspection | 11/26/2019 | 11/26/2019 | 11/26/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/11/2019 | 10/11/2019 | 10/14/2019 | | PASS |
Andy J. Long
|
|
|
All homes are complete in sub, common areas stabilized/landsacepd. Once DI bags are removed the ESC permit may be finaled. RP notified.
|
General Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 | | PASS |
Michael Zawacki
|
|
|
All home exteriors completed, site has been landscaped. No ESC issues.
|
General Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 | | PASS |
Michael Zawacki
|
|
|
Homes in rear of development completed and landscaped. All concrete work looks completed, all work is framing or inside homes. Trash is contained, no ESC issues at site. All lots currently under construction.
|
Tracking Control | 5/22/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Michael Zawacki
|
|
|
Curtis clean sweep on site.
|
Tracking Control | 5/20/2019 | 5/22/2019 | 5/22/2019 | A | FAIL |
Michael Zawacki
|
|
|
Contractor only cleaned small area. Sent message to Jason Jones, listed RP. Follow up scheduled.
|
General Inspection | 5/17/2019 | 5/20/2019 | 5/20/2019 | P | FAIL |
Michael Zawacki
|
|
|
Pump truck drove in mud and made mess with trackout. Crew sweeping, follow up scheduled for 5-22
|
General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 | | PASS |
Michael Zawacki
|
|
|
Work on homes in rear. Foundation at front complete, no new work. Inlet protection installed and about 1/4th full.
|
Conference | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | DONE |
Andy J. Long
|
|
|
new Neighborworks contact info for project:
- Joe 208.941.3904
- Shelly 208.258.6220
|
General Inspection | 1/4/2019 | 1/4/2019 | 1/7/2019 | | PASS |
Andy J. Long
|
|
|
Storm drains have sediment protection. Ecopan concrete washout on site and has remaining capacity. Trackout within subdivsion occuring, no trackout to Ormund Street. SFHs now in progress and permitted seperately.
|
General Inspection | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on multiple homes and grading. oundation poured, did not see washout on site, no sign of dumped washout. No dirt leaving site, trackout on road inside site.
|
General Inspection | 10/12/2018 | 10/12/2018 | 10/15/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity, growth on lots and stable.
|
General Inspection | 8/27/2018 | 8/27/2018 | 8/27/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity.
|
Aging Inspection | 7/10/2018 | 7/10/2018 | 7/10/2018 | | PASS |
Michael Zawacki
|
|
|
No new work. Lots all have survey stakes and no activity. Weeds are starting to grow providing stabalization.
|
General Inspection | 5/10/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Michael Zawacki
|
|
|
Roads and sidewalks complete. Site is sitting idle. Area is stabalized.
|
General Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Andy J. Long
|
|
|
No new activity. Subdivision infrastructure complete, storm drain has sediment protection. Permit sign posted. Lots have vegetation growing. Approved.
|
General Inspection | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Michael Zawacki
|
|
|
see if work has occurred; call JEC about project Utilities complete. Road, curb & gutter, and sidewalk installed. No work on homesites has begun.
|
Issue & PRINT permit COM | | | 8/2/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/25/2017 | | 7/25/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan/SWPPP approved. Valid PD and RP designated. Site preparation inspection is required, call ###-#### to schedule.
|
Application received | | | 7/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2017 4:45PM
|