Site Final | 1/2/2019 | 1/4/2019 | 1/7/2019 | A | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/1/2019 | 1/1/2019 | 1/2/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 11/8/2018 | 11/13/2018 | 11/13/2018 | P | NR |
Michael Zawacki
|
|
|
Inlet protection needs to be removed from parking lot an alley.
|
Site Final | 10/29/2018 | 11/8/2018 | 11/8/2018 | A | NR |
Andy J. Long
|
|
|
|
General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Andy J. Long
|
|
|
Building complete. WIP on landscaping and exterior site improvements. No trackout or discharges, landscape crew will need to clean up after work on north side of site on Wilshire.
|
General Inspection | 10/16/2018 | 10/16/2018 | 10/16/2018 | | PEND |
Michael Zawacki
|
|
|
Only north exit still needs to be finished and paved, rest of building and parking lot done. Landscapers on site, topsoil and mulch being stored on pavement. Area will need to be swept when landscapers leave site.
|
General Inspection | 8/31/2018 | 8/31/2018 | 8/31/2018 | | PASS |
Michael Zawacki
|
|
|
Crew on site prepping lot for paving, lots of piled of road mix on site. Painters are dumping cleanup water straight onto ground.
|
General Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Cinder block work complete, will be no more block cutting. Small area of sidewa;lk scheduled to be poured today. No trackout or blowing dust.
|
General Inspection | 5/3/2018 | 5/15/2018 | 5/15/2018 | P | PASS |
Michael Zawacki
|
|
|
check on dust Walked site, ground is hard and only a lift moving around site. Masons have saw for cutting blocks, probably source of dust, not in use at time of inspection. Site is dirty around mortar mixer. Did not see foreman while on site, no one was in trailer.
|
General Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on new CVS. Storm drains on Cole and in parking lot have sediment protection. Ecopan concrete washout in use at site.
Discussed with onsite manager Mark to request water truck for dust control for forklift moving around site. He stated water truck will be in use this afternoon.
Trash contained, no trackout. Approved.
|
General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Michael Zawacki
|
|
|
Demo is complete, work to begin on new footings soon. No ESC issues, site is all contained.
|
Site Preparation | 3/6/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Andy J. Long
|
|
|
1:30 PM
Preconstruction conference for demolition and new build project for CVS. No silt fence perimeter required, site retains stormwater.
Will install sediment bags on Cole where construction access will be. Asphalt to be preserved. Permit sign on site. Approved for construction. First phase is demolition.
Project manager is John (###-####)
|
Issue & PRINT permit COM | | | 3/1/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/18/2017 | | 8/18/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map and narrative submitted. Need to designate RP at time of contract bid. Site preparation inspection required.
|
Application received | | | 8/2/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 2 2017 2:26PM
|