Site Final | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/28/2018 | 6/28/2018 | 6/28/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Michael Zawacki
|
|
|
check for permit sign and BMPs. DI protection installed. Curb will remain on perimeter. SWPPP board and permit onsite.
|
General Inspection | 10/31/2017 | 11/7/2017 | 11/7/2017 | P | CANC |
Michael Zawacki
|
|
|
check for permit sign and BMPs. DI protection installed. Curb will remain on perimeter. SWPPP board and permit onsite.
|
Conference | 10/31/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Andy J. Long
|
|
|
Pre-construction conference call. Approved to begin activities at site, will post ESC permit, protect inlets on Enterprise, and provide concrete washout.
RP aware of ESC permit requirements. Approved.
|
Permit Ready to Issue | | | 10/30/2017 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/30/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/18/2017 | | 8/18/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan with narrative and map approved. Valid stormwater runoff management team. Site preparation inspection required.
|
(F) Reprint permit | | | 8/9/2017 | | DONE |
|
|
|
|
Application received | | | 8/8/2017 | | |
|
|
|
|