Site Final | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Andy J. Long
|
|
|
Hays Street stair case is complete. No loose materials of concrete dust left on sidewalk or gutter. ESC permit conditions satisfied.
WIP on main entrance on 8th Streeet, see ESC18-00692.
|
General Inspection | 6/28/2018 | 6/28/2018 | 6/28/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Very small amount of disturbance, all contained to site. Material and stones being store in parking lot across Hays. No ESC issues.
|
Issue & PRINT permit COM | | | 9/20/2017 | | DONE |
|
|
|
|
Application received | | | 8/14/2017 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/14/2017 | | 8/14/2017 | | PASS |
Andy J. Long
|
|
|
|