Site Final | 11/29/2017 | 11/29/2017 | 11/29/2017 | A | PASS |
Andy J. Long
|
|
|
Demolition phase complete, vertical construction in progress. Project covered under ESC17-00891
|
General Inspection | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/3/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Michael Zawacki
|
|
|
Working on installing sewer tap. No dirt or dust leaving site. Have rented parking from red lion so everything is on pavement. Met with Todd Deike, project superintendent.
|
General Inspection | 10/11/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
All material still in site. No dust, been keeping it wet. Asphalt still in use as haul roads. Advised to keep wet and keep an eye on dust.
|
Site Preparation | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | PASS |
Michael Zawacki
|
|
|
Did site walk through with contractor. BMPs installed and in place. Perimeter wattles, DIs, will preserve paved area. Addressed dust from demolition, water truck will be used.
|
Issue & PRINT permit COM | | | 8/16/2017 | | DONE |
|
|
|
|
Application received | | | 8/15/2017 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/15/2017 | | 8/15/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. This permit currently for AAI and the demolition work they will be completing for project.
|