Aging Inspection | 3/23/2020 | 3/23/2020 | 3/23/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 1/20/2020 | 1/20/2020 | 1/23/2020 | | PASS |
Andy J. Long
|
|
|
No corrections needed.
|
Aging Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 9/16/2019 | 9/16/2019 | 9/16/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work nearly completed. Lot has weeds that have grown to act as stabilization
|
Aging Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 | | PASS |
Michael Zawacki
|
|
|
Lot is overgrown and stable.
|
Aging Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | | PASS |
Michael Zawacki
|
|
|
No trackout, not accessing the back through neighboring lot. Some trash on site, will need to watch poly covering material and make sure it doesn't blow away.
|
Complaint Inspection | 1/10/2019 | 1/10/2019 | 1/11/2019 | P | FAIL |
Michael Zawacki
|
|
|
Nonstabalized entrance in back, trackout was cleaned. Washout dumped on ground. Left notice on door.
|
General Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Michael Zawacki
|
|
|
Met with builder on site. Has someone scheduled to cleal all trash around site. Nothing leaving site.
|
Aging Inspection | 10/10/2018 | 10/10/2018 | 10/11/2018 | | PASS |
Michael Zawacki
|
|
|
Work on interior, still no landscaping. One pile of trash in front. No discharges.
|
Aging Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Yard not yet landscaped. NO trackout or loose trash. Site is in compliance.
|
General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on interior. Yard not yet landscaped. No discharges, uncontained trash, or loose material leaving site.
|
General Inspection | 11/24/2017 | 11/27/2017 | 11/27/2017 | A | PASS |
Andy J. Long
|
|
|
Permit sign provided to onsite supervisor Bill. Trackout to Walnut is cleaned daily per Bill. Once framing is complete, will stabilize area and restrict access.
|
General Inspection | 11/17/2017 | 11/20/2017 | 11/24/2017 | A | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | FAIL |
Andy J. Long
|
|
|
Christina Phone #: ###-####
Mud tracked on Walnut and Krall by framers. No stabilized construction access or rock, low lying lot also very muddy spot.
Correction request: - clean up mud and especially all mud clods in both streets - once framing is up, restrict access to muddy areas. - install gravel bag check dam in gutter just south of the portapot and north of Franklin.
Corrections issued to GC Sean on 11/16 PM. Follow up to be conducted.
|
Permit Ready to Issue | | | 9/22/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 9/22/2017 | | DONE |
|
|
|
|
Application received | | | 8/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 19 2017 3:16PM
|