Site Final | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 7/18/2018 | 7/18/2018 | 7/19/2018 | | PASS |
Michael Zawacki
|
|
|
Cinder block work looks complete. Work area is on car lot, site clean and contained.
|
Random Inspection | 5/18/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Andy J. Long
|
|
|
No trackout or discharges. Permit sign posted on job trailer. Construction entrance and MS4 inlet protection installed.
|
Site Preparation | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Michael Zawacki
|
|
|
Tony Phone #: ###-#### Work area is in existing parking lot. Inlets are protected, area is kept clean.
|
Issue & PRINT permit COM | | | 3/19/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/1/2017 | | 11/1/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver approved. Need to designated certified RP for project.
|
Application received | | | 8/21/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2017 1:00PM
|