Site Final | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No corrections needed. All permits finaled.
|
Site Preparation | 11/7/2017 | 11/7/2017 | 11/8/2017 | A | PASS |
Andy J. Long
|
|
|
SWO lifted, corrections complete. Uncontained concrete washout and wallboard has been cleaned up. Re-inspection fee paid.
Site is back in compliance.
|
General Inspection | 11/3/2017 | 11/6/2017 | 11/6/2017 | A | PEND |
Andy J. Long
|
|
|
post SWO sticker
Mike with Syringa called to respond to corrections and SWO.
Will pay fine and work on clean up today. Will reinspect to verify compliance. RP stated they had paid the concrete company extra fee to washout offsite.
|
Fees Due Hold | 11/4/2017 | | 11/6/2017 | | DONE |
Christina Prado
|
|
|
|
Stop Work Order | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | FAIL |
Andy J. Long
|
|
|
Multiple violations, unaddressed corrections on Syringa sites in Odom Estates.
SWO in effect until washout is clean, site is swept, sign properly posted (not on street sign), and re-inspection fee is paid.
|
BMP Violation | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | FAIL |
Andy J. Long
|
|
|
Dirty site. No concrete washout provided, washed out in onsite swale.
Syringa also did not clean up wallboard washout from 2616 Neff, ESC already finaled.
SWO issued, re-inspection fee due and pass site ESC inspection.
|
Site Preparation | 10/17/2017 | 10/18/2017 | 10/18/2017 | A | PART |
Michael Zawacki
|
|
|
Some light track out. Pile of stones in front of port-o-pottie on road. Garbage is full and needs to be removed. No dirt work going on, only home work.
|
Site Preparation | 10/17/2017 | 10/17/2017 | 10/18/2017 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
VOIDED CHANGE STATUS | | | 10/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 10/13/2017 | | DONE |
|
|
|
|
Application received | | | 8/23/2017 | | |
|
|
|
|