Site Final | 7/31/2018 | 8/2/2018 | 8/8/2018 | A | PASS |
Andy J. Long
|
|
|
Home complete & landscaped. Subdivision BMPs to remain installed for ongoing construction.
|
General Inspection | 7/31/2018 | 7/31/2018 | 7/31/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
BMP Violation | 1/17/2018 | 1/22/2018 | 1/25/2018 | P | PASS |
Andy J. Long
|
|
|
Permit signs posted, DI sediment bags have been cleaned out and reinstalled. No major trackout.
|
BMP Violation | 1/10/2018 | 1/17/2018 | 1/17/2018 | P | FAIL |
Andy J. Long
|
|
|
check: DI bags Trackout clean up & prevention measures permit sign posting
check: DI bags Trackout clean up & prevention measures permit sign posting
No DI bag maintenance completed as requested. Noted in SWPPP inspection log that maintenance has been called for since October. Continued work through muddy conditions makes it hard to tell if track out was cleaned after initial correction request.
Posted green City of Boise ESC permit signs on projects on Trapper.
2nd warning now issued, follow up scheduled for Monday 1/22
|
General Inspection | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | FAIL |
Michael Zawacki
|
|
|
No permit displayed. Trackout onto sidewalk and road. DI bags below site are full of sediment.
|
Permit Ready to Issue | | | 10/20/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 10/20/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/19/2017 | | 9/19/2017 | | PASS |
Andy J. Long
|
|
|
Certified RP and PD provided, ESC plan with site map and project narrative. Site preparation inspection is required.
|
Application received | | | 9/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2017 2:06PM
|