Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC17-01265
StatusFinaled
Name CLAYTON CONNER
Site Address 3862 N SANDPOINT WAY
Project NameHighlands Cove lot 9 block 3
Customer Number 
ePlanReviewNo
Description
ESC site plan with narrative and BMP details provided. Subdivision BMPs installed including central designated concrete washout, inlet protection, and erosion control practices and applications on slopes between parcels. Each site should have trash containment, stabilized entrance/loading area. Install perimeter wattles on down hill side of lot. ESC site preparation inspection is required.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/26/20184/26/20184/26/2018PPASS
DetailsAndy J. Long
Home complete and landscaped. Subdivsion BMPs to remain installed. Highlands Cove in good condition.
General Inspection1/8/20181/8/20181/8/2018PPASS
DetailsMichael Zawacki
WIP. Site clean, everyone is parking in road. Adjacent lot used for some storage is muddy. No one is driving on it so no trackout.
Site Preparation10/19/201710/19/201710/19/2017APASS
DetailsAndy J. Long
Clayton ###-####

Permit sign posted, perimeter wattles installed. Subdivision inlets have sediment protection, concrete washout located at top of hill nat Braemere entrance to Highlands Cove.

Correction request to properly install concrete washout (outpak lining) and move closer to road for concrete truck operators.
Permit Ready to Issue  10/3/2017 DONE
Issue & PRINT permit SFD  10/3/2017 DONE
Application received  9/18/2017  
Routing - Erosion and Sediment9/18/2017 9/18/2017 PASS
DetailsAndy J. Long
ESC site map with project narrative approved. Valid RP designated; site preparation inspection is required.