Site Final | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted, trash contained, storm drains have sediment protection.
Trackout is from adjacent project on Northview, see ESC18-00224.
|
General Inspection | 1/18/2018 | 1/22/2018 | 1/22/2018 | A | PART |
Michael Zawacki
|
|
|
WIP on SFH. Some trackout onto road and sidewalk from workers parking in project area. Trusses are blocking sidewalk. Silt fence along western perimeter is not trenched in. Some lumber piles on site but free of blowing trash. Dis are clean. Left message with RP Bill.
|
Permit Ready to Issue | | | 11/22/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 11/22/2017 | | DONE |
|
|
|
|
Application received | | | 9/26/2017 | | |
|
|
|
|