Site Final | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | A | PASS |
Andy J. Long
|
|
|
WIP on frame for new building. Existing asphalt access to work area has been preserved. No violations observed.
|
Site Preparation | 11/8/2017 | 11/8/2017 | 11/9/2017 | P | CANC |
Andy J. Long
|
|
|
Dave ###-####
|
Site Preparation | 11/9/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Andy J. Long
|
|
|
Perimeter sediment controls and construction entrances installed at both access points. Stormwater drains towards center of site. New stormwater vaults being installed.
Approved.
|
Issue & PRINT permit COM | | | 11/3/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 10/20/2017 | | 10/20/2017 | | DONE |
Michael Zawacki
|
|
|
|
Application received | | | 9/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 29 2017 8:16AM
|