DOC - Permit Finaled | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 9/13/2018 | 9/13/2018 | 9/13/2018 | | DEFR |
Michael Zawacki
|
|
|
|
Permit Ready to Issue | | | 10/18/2017 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/18/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/10/2017 | | DONE |
|
|
|
no call made-Brian Murphy talked to Dave M. He needs drawings from Dave before he'll aprove the permit
|
Application received | | | 10/3/2017 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/3/2017 | | 10/3/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Valid RP designated.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2017 | | |
|
|
|
|