Site Final | 10/12/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No ESC corrections.
|
Aging Inspection | 10/12/2018 | 10/12/2018 | 10/12/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Andy J. Long
|
|
|
No trackout or sediment runoff from site. Trash picked up and contained.
No ESC permit posted. New sign placed on trash box.
|
Random Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | FAIL |
Michael Zawacki
|
|
|
Lots of loose trash. A few scattered piles and ground littered and blowing into neighbors yard. Washout has been dumped onto ground.
|
Permit Ready to Issue | | | 11/13/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 11/13/2017 | | DONE |
|
|
|
|
Application received | | | 10/18/2017 | | |
|
|
|
|