DOC - Permit Finaled | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Andy J. Long
|
|
|
see ESC18-00476 for ESC permit coverage
|
General Inspection | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | PASS |
Andy J. Long
|
|
|
No activity or crew onsite at time of inspection. Site grading and utility installation has been completed.
BMPs: - silt fence perimeter sediment control installation - rock construction entrance and road mix installed on site haul routes. - storm drain sediment filter bag installed on MS4 on Emerald. - City of Boise ESC permit sign posted.
Notified RP that a site preparation inspection should have been conducted and the CGP 2017 permit signage requirements are not posted.
|
Permit Ready to Issue | | | 5/24/2018 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 5/24/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/24/2018 | | 4/24/2018 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Need to designate certified Responsible Person prior to issuance.
|
Routing - Erosion and Sediment | 12/14/2017 | | 12/14/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Need to designate certified Responsible Person prior to issuance.
|
Application received | | | 12/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 6 2017 12:53PM
|