General Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 | | PASS |
Andy J. Long
|
|
|
All permits finaled. No disturbed area or temp BMPs remaining. No corrections.
|
DOC - Permit Finaled | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/13/2018 | 9/13/2018 | 9/14/2018 | | PASS |
Michael Zawacki
|
|
|
Small section of saw cut in parking lot. Some pit run and rebar stored on site.
|
Random Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Andy J. Long
|
|
|
WIP. ESC permit sign posted, no trackout or discharges.
|
Issue & PRINT permit COM | | | 2/22/2018 | | DONE |
|
|
|
|
Application received | | | 12/15/2017 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/15/2017 | | 12/15/2017 | | DONE |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved by certified PD. RP TBD, site preparation inspection required.
|