General Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 1/7/2020 | 1/8/2020 | 1/10/2020 | P | NR |
Michael Zawacki
|
|
|
Sent message to RP to remove DI bag from street.
|
General Inspection | 1/7/2020 | 1/7/2020 | 1/7/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 11/22/2019 | 11/22/2019 | 11/22/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | | PASS |
Michael Zawacki
|
|
|
All work completed. DI protection needs to be removed from Cory.
|
General Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with foreman at site. Inlet protection on Cory and inside site can be removed. Site stable and landscaped.
|
General Inspection | 7/22/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with Andy the builder on site. Landscapers on site planting trees and shrubs, expect to have sod down by end of week. No esc issues.
|
General Inspection | 7/19/2019 | 7/19/2019 | 7/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PEND |
Michael Zawacki
|
|
|
Prepping site for landscaping. Crew using power rake attatchment on bobcat and it is causing lots of dust. Grass between sidewalk and road is grown, blocksome mat can be removed. No trackout.
|
General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Michael Zawacki
|
|
|
Sand for seepage beds stored on parking lot. Trash needs to be picked up soon, contained in pikles but getting large.
|
Random Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Nothing leaving site. Lots of wood scraps in site.
|
General Inspection | 3/1/2019 | 3/1/2019 | 3/4/2019 | | PART |
Michael Zawacki
|
|
|
Everything contained in site. Area has lots of trash and building waste, lots of dirt on paved surfaces.
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PART |
Michael Zawacki
|
|
|
WIP on vertical. Sigt is fenced off, gate open. Inlet to west on Cory has had blocksome damaged. Washout still on site and being used. Lots of loose dirt in site.
|
Permit Ready to Issue | | | 1/14/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/14/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/20/2018 | | 9/20/2018 | | DONE |
Andy J. Long
|
|
|
ESC site plan to be modified to accomodate changes to Grading and drainage. Original site development permit ESC17-01426 shall be closed once this permit is issued. This will be main permit for the site and the 4 buildings.
|
Routing - Erosion and Sediment | 4/25/2018 | | 4/25/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved under ESC site development permit ESC17-01426. Each apartment building requires individual ESC permit. Valid stormwater team designated
|
Application received | | | 1/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 10 2018 11:39AM
|