Site Final | 5/18/2018 | 5/18/2018 | 5/21/2018 | P | PASS |
Andy J. Long
|
|
|
Demo complete. Roadwork now in progress.
|
Site Preparation | 2/22/2018 | 2/22/2018 | 2/23/2018 | P | PASS |
Andy J. Long
|
|
|
Jill Phone #: ###-####
ESC permit sign posted on chainlink fence on east side of property. Existing storm drains (onsite and MS4) have sediment protection. Asphalt to be preserved during buidling demo for haul off. Wattles on site to protect stockpiles as needed and to control perimeter. Approved.
|
Permit Ready to Issue | | | 1/19/2018 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/19/2018 | | DONE |
|
|
|
|
Telephone call | | | 1/19/2018 | | DONE |
|
|
|
no phone call-system shut down-lost signed permit
|
Application received | | | 1/16/2018 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/16/2018 | | 1/16/2018 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Valid RP designated. Site preparation required.
|