Site Final | 4/16/2019 | 4/16/2019 | 4/17/2019 | P | PASS |
Andy J. Long
|
|
|
see ESC15-00853 for remaining inspections at North HIll sub. Site is in compliance. Storm drains have sediment protection, trash containment on site, trained excavator and on site RP. Approved.
|
General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | | PART |
Michael Zawacki
|
|
|
Some trackout coming from empty lot, not reaching hill road.
|
General Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | | PASS |
Michael Zawacki
|
|
|
All work is interior, new phases haven't begun. Some tracking from delivery of rock, no trackout leaving site. Upper witches hat about half full.
|
General Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 2-25. No new phases have begun, no new disturbances.
|
General Inspection | 2/11/2019 | 2/11/2019 | 2/12/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior completed, all work inside. No ESC issues on site.
|
General Inspection | 1/24/2019 | 1/24/2019 | 1/24/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean. Trackout was cleaned up.
|
General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/25/2018 | 12/25/2018 | 12/26/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior work completed. No esc issues on site.
|
General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | | PASS |
Michael Zawacki
|
|
|
Vacant lot for next building is sitting idle. All workers onsite are doing interior work.
|
General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 | | PASS |
Andy J. Long
|
|
|
WIP. North Hill subdivision BMPs installed. Regular housekeeping occuring. No corrections requested.
|
General Inspection | 11/2/2018 | 11/2/2018 | 11/2/2018 | | PASS |
Andy J. Long
|
|
|
WIP on 4 units at North HIll Townhomes/Hill Terrace. Storm drains have sediment protection, trash contained, crew onsite sweeping up some trackout onto Hill Terrace.
Review washout requirements with onsite crew man and RP Ron, Site is currently in good condition.
|
General Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 | | PART |
Michael Zawacki
|
|
|
Working on interiors. Lots of dirt tracked in front of building, needs to be swept.
|
Site Preparation | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | CANC |
Andy J. Long
|
|
|
Late after - Jeremy Phone #: ###-####
Intended for foundation inspection
|
Permit Ready to Issue | | | 3/27/2018 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 3/27/2018 | | DONE |
|
|
|
|
Application received | | | 1/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 18 2018 9:03AM
|