Aging Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | | DONE |
Andy J. Long
|
|
|
Construction complete, site stabilized/landscaped.
|
DOC - Permit Finaled | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 10/21/2019 | 10/21/2019 | 10/21/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 4/15/2019 | 4/15/2019 | 4/16/2019 | | PEND |
Andy J. Long
|
|
|
BLD and other permits still open; DI bag stilll. Construction complete and home occupied.
|
Aging Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 | | FAIL |
Andy J. Long
|
|
|
Temporary sediment bags installed for project have not been removed after stabilization.
Work appears complete. BLD permit is not finaled.
Winter conditions, will follow up when not frozen. No discharges or sediment leaving property
|
Aging Inspection | 12/13/2018 | 12/13/2018 | 12/17/2018 | | PASS |
Michael Zawacki
|
|
|
No disturbances, work looks complete.
|
Site Final | 9/24/2018 | 9/24/2018 | 9/26/2018 | P | NR |
Andy J. Long
|
|
|
Notified homeowner RP Sherry to remove temporary storm drain sediment filter bags on Wilson. She stated she will have a crew complete that next week as well as sweeping up dirt/sand in front of home.
|
Site Final | 8/21/2018 | 8/22/2018 | 8/23/2018 | A | NR |
Andy J. Long
|
|
|
DI bags still installed. Project near completion. Will notify homeowner RP
|
Site Final | 7/19/2018 | 7/20/2018 | 7/24/2018 | P | NR |
Andy J. Long
|
|
|
Project near completion: Yard is landscaped, new driveway poured. BLD is open
ESC actions required prior to ESC site final approval: - sweep up and clean any loose dirt or sediment tracked out from site onto Wilson - remove temporary sediment protection bags from strom drains on Wilson
|
Tracking Control | 6/25/2018 | 6/26/2018 | 6/29/2018 | P | PASS |
Andy J. Long
|
|
|
check for trackout clean up
Trackout cleaned up.
|
Tracking Control | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | FAIL |
Andy J. Long
|
|
|
Trackout from unpaved driveway observed. Will check back for clean up.
|
General Inspection | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted. No trackout. Recieving stormdrains on Wilson St. have sediment filter bags installed.
|
Issue & PRINT permit SFD | | | 1/29/2018 | | DONE |
|
|
|
|
Application received | | | 1/26/2018 | | |
|
|
|
|