General Inspection | 6/22/2020 | 6/22/2020 | 6/26/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/20/2020 | 4/20/2020 | 4/20/2020 | | PASS |
Michael Zawacki
|
|
|
All work contained behind shop. Pad is poured, some materials stored in front parking lot.
|
General Inspection | 2/17/2020 | 2/17/2020 | 2/18/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/16/2019 | 12/16/2019 | 12/17/2019 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Michael Zawacki
|
|
|
Met with shop owner. Perimeter controls in place, entrance and washout installed. Site is good to go.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | | PASS |
Andy J. Long
|
|
|
No work started yet. BLD permit recently paid for and issued.
|
Issue & PRINT permit COM | | | 9/18/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/4/2019 | | 3/4/2019 | | DONE |
Michael Zawacki
|
|
|
RP needed before work begins. Site prep inspection required.
|
Application received | | | 2/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 7 2018 11:27AM
|