Site Final | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Michael Zawacki
|
|
|
Home is framed and walled. Pile of dirt in front of home, contained to site. Nothing leaving area.
|
General Inspection | 5/22/2018 | 5/22/2018 | 5/22/2018 | P | FAIL |
Michael Zawacki
|
|
|
No concrete washout on site, washout has been dumped on lot across drive. Backfill is stored on lot and on lot across street. Central driveway is covered with dirt.
|
Issue & PRINT permit SFD | | | 4/23/2018 | | DONE |
|
|
|
|
Application received | | | 4/6/2018 | | |
|
|
|
|