Site Final | 3/20/2019 | 3/21/2019 | 3/26/2019 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Subdivisoin BMPs to remain installed. ESC permit finaled.
|
General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 | | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Andy J. Long
|
|
|
Les Phone #: ###-####
Perimeter wattles installed. Subdivision strom drains have inlet protection; designated concrete washout area on Hootowl. Rear silt fence trenched in.
Approved for construction.
|
Issue & PRINT permit SFD | | | 6/1/2018 | | DONE |
|
|
|
|
Application received | | | 4/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2018 9:34AM
|