Site Final | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Subdivisoin BMPs to remain installed. ESC permit finaled.
|
Site Preparation | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Andy J. Long
|
|
|
Les Phone #: ###-####
BMPs installed. RP on duty, will post ESC sign.
Approved for construction.
|
Issue & PRINT permit SFD | | | 6/1/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/16/2018 | | 5/16/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified stormwater team. Site preparation inspection required. Perimeter silt fence per plan is required.
|
Application received | | | 5/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2018 4:21PM
|